挪威
拉斯·皮特·彼得森
Førrevassdammen
马萨特电厂
Malset is a hydropower plant at Lake Malsetevatnet in Vik Municipality in Vestland County.
-
1967投入使用
-
24 MW装机容量
-
70.2、妇女年生产
The plant uses a height of fall of about 180 metres between the regulating reservoir Lake Årebotnvatnet and Lake Malsetevatnet.
Lake Årebotnvatnet is regulated between 984 and 994 metres above sea level. The power plant is also supplied with water from several stream intakes and Lake Muravatnet, which is regulated between 1,060和1,020 metres above sea level. The water used in 马萨特电厂 is later reused in Refsdal power plant.
The power plant has a Francis turbine.
公司 | 所有权份额 |
十大最好的网赌平台 | 88% |
Sognekraft | 12% |